Study guides › Level 8 · Algebra 2
More workers, fewer days (inverse variation)
💡 The idea
When one thing goes up and the other goes down so that their product stays the same, find that product first.
🪜 The steps
- Multiply to get the total job (painter-days, or miles).
- Divide by the new number.
✏️ Worked examples
1. 6 painters, 10 days, now 4 painters: 60 painter-days ÷ 4 = 15 days.
2. 60 mph for 4 hours, now 80 mph: 240 miles ÷ 80 = 3 hours.
⚠️ Watch out
- Sense-check: fewer workers should take longer, not less time.
🎯 Try these
- 8 workers take 6 days. How long for 12 workers?
- 50 mph takes 6 hours. How long at 75 mph?
- 5 pumps take 12 hours. How long for 3 pumps?
Answers: 1) 4 days 2) 4 hours 3) 20 hours
This guide is also in the 10MathQ app: tap “📖 Study guide” after a question.